Aerospace Sourcing
Part standards

Mil-Spec vs Commercial Parts: What Is the Difference, and When Can You Swap?

A mil-spec part is defined and verified by a government specification or standard (MIL, MS, AN). NAS, NASM and SAE AS parts follow industry aerospace standards, and commercial parts follow a maker's catalog or general industrial standards. Since the 1994 Perry memo, DoD prefers performance specs and industry standards. Any substitution needs design authority approval.

Updated

What separates a mil-spec part from a commercial part?

Who controls the definition and how conformance is proven. A mil-spec or aerospace standard part is defined by a published document with stated requirements, tests and often a qualification or source control requirement. A commercial part is defined by its maker, who can change it without asking you.

That difference shows up in four places a buyer cares about: whether the design can change under you, whether there is a required test or qualification, whether the part number by itself identifies a controlled configuration, and what paperwork the supply chain is used to providing. A commercial part can be excellent. It just carries none of those controls unless your purchase order adds them.

How do MIL, MS, AN, NAS, NASM and SAE AS part standards compare?

They differ mainly in who issues and maintains the document. The prefixes below are the ones buyers see most on aerospace drawings. Status examples are ones confirmed in the cited sources; for anything else, confirm the current revision on ASSIST or SAE.

PrefixIssued and maintained byWhat it isVerified example or status note
MIL-PRFDoD preparing activityPerformance specification: required results and how compliance is verified, not how to make itIdentifier format set by MIL-STD-961E
MIL-DTLDoD preparing activityDetail specification: design requirements such as materials or construction; a spec with both kinds of requirement counts as detailIdentifier format set by MIL-STD-961E
MSOriginally DoD military standard sheetsPart standards, mostly hardwareAIA has converted over 500 MIL documents to NAS, and those parts continue to be procured to the MS part number
ANOriginally Army-Navy standardsOlder hardware standardsAN3 thru AN20 bolts were canceled by Notice 1 (1 December 1999) and superseded by NASM3 thru NASM20, with identical part numbers
NASAerospace Industries Association (AIA)National Aerospace Standards, voluntary industry standardsAIA states more than 1,100 active standards; AIA is an ANSI accredited standards developer
NASM, NAMAIAFormer military documents converted to NAS, inch (NASM) or metric (NAM)Part numbers commonly keep the MS or AN number
SAE AS, AMSSAE InternationalAerospace standards (AS) and aerospace material specifications (AMS)QQ-P-416 cadmium plating was canceled in 2002 and superseded by SAE AMS-QQ-P-416; AS8879 covers UNJ inch threads
CommercialThe manufacturer, sometimes citing general industrial standardsCatalog partsDesign and materials can change at the maker's discretion unless the PO controls them

The practical point: an old drawing can carry an AN, MS or federal callout that now lives under an AIA or SAE document. That does not make it a different part, but it does change where you look up the current requirements and which revision you put on the PO.

Have a part like this?Send it in under a minute. A person replies within 1 business day.

What did the 1994 Perry memo change?

It reversed the default. Before it, military specifications were the norm; after it, they became the last resort. On June 29, 1994, Secretary of Defense William Perry issued the memorandum titled Specifications and Standards, A New Way of Doing Business.

As reproduced in a National Research Council report on its effects, the memo directed that performance specifications be used when buying new systems, major modifications, upgrades to current systems, and nondevelopmental and commercial items. Where a performance specification is not practicable, a non-government standard should be used. Military specifications and standards were authorized only as a last resort, with an appropriate waiver.

The same NRC report notes the policy had mixed and perhaps unintended consequences for materials and process specifications, which is part of why buyers still find canceled, inactive and converted documents on active drawings. The principle survives in the FAR today: FAR 11.002 tells agencies to state requirements in terms of functions, performance or essential physical characteristics and to define requirements so offerors can supply commercial products.

What is the difference between a performance spec and a detail spec?

A performance specification says what the item must do and how to verify it. A detail specification says how to make it. MIL-STD-961E, the DoD standard for specification format, gives both definitions and the matching identifiers, MIL-PRF and MIL-DTL.

Under MIL-STD-961E, a performance specification states requirements in terms of required results with criteria for verifying compliance, without stating the methods for achieving them, and defines functional requirements, operating environment, and interface and interchangeability characteristics. A detail specification specifies design requirements such as materials, how a requirement is achieved, or how an item is fabricated. A document that mixes both is still a detail specification.

For a buyer, a performance spec leaves more room for alternate sources, as long as the alternate proves the required results. A detail spec ties you to the stated materials and methods, which narrows substitutes and raises the bar for any commercial equivalent.

What does inactive for new design mean?

The item can still be bought for existing equipment, but it must not be designed into anything new. MIL-STD-961E says an inactive for new design notice shows that an item covered by a specification is prohibited from use in new design and is used only in existing equipment or for future contracts to buy more of existing equipment.

  • If a superseding document covers items usable in new design, the notice references it.
  • If a QPL is associated with the inactive specification, the QPL is maintained until acquisition of the product is no longer required, then both are canceled.
  • Canceled is different: a cancellation notice is issued when the specification is no longer required and may recommend a replacement document.
  • Inactive and canceled documents can be reactivated or reinstated by a later notice, so check the current status rather than an old notice.

If you are sustaining a fielded system, inactive for new design is normal and the part is still the right part. If engineering is starting a new design, it is a signal to move to the superseding document. Our QPL guide covers what happens to qualified sources as a specification winds down.

When is a commercial equivalent acceptable?

When the governing drawing or specification allows it and the people who own the design agree it is equivalent for this application. Equivalent on a datasheet is not the same as acceptable on your drawing.

Questions engineering should answer before a commercial part goes in:

  • Does the drawing call a specific part number, a specification that any conforming part can meet, or a source-controlled item? Source control ends the discussion unless the design owner adds a source.
  • Does the specification require qualification? A commercial part cannot satisfy a QPL requirement it is not listed under.
  • Do material, strength, temperature, vibration, corrosion and finish requirements match, including thread form such as UNJ versus UN on fasteners?
  • Are there restrictions that follow the material rather than the part, such as DFARS specialty metals, outgassing limits for spacecraft, or prohibited finishes?
  • Can the maker change the commercial part without notice, and does your configuration control tolerate that?
  • What traceability does the contract require, and can the commercial channel provide it?

Fasteners and seals are where commercial look-alikes cause the most trouble. The bolts and screws and O-rings pages show how aerospace versions are specified.

Who must approve a commercial substitute?

The organization that owns the design, in writing, before the part is bought. Not the buyer, not the distributor, and not the machine shop that would like to use what it has on the shelf.

For a company drawing, that is the engineering authority named in your configuration control process. For a government owned design on a DoD contract, a departure from the contract requirements is a contract matter for the government to approve, not something a supplier can grant itself, and source-controlled spares carry their own rule: DFARS PGI 217.7506 defines acquisition method suffix code C as a part that requires engineering source approval by the design control activity. When you are a sub, your customer's flow-downs decide who you ask.

Keep the approval with the PO and the receiving record. If the approval is not documented, the substitute is a nonconformance waiting to be found at audit. Our RFQ checklist shows how to state on a request whether equivalents are allowed.

How do we handle drawings that mix mil-spec and commercial callouts?

We source exactly what the drawing and PO call out, and we flag substitutions instead of making them. We do not hold inventory, publish prices or act as an authorized distributor for any manufacturer.

For standard hardware we buy from the manufacturer or its authorized and franchised distributors, flow your specification revisions and clauses down, and check certs against the callout before shipment. Where an old AN, MS or federal callout now lives under a NASM, NAS or SAE document, we tell you what changed so engineering can decide, rather than quietly shipping the new designation. Standard parts can go on the same PO as machined and fabricated parts, or into kits. If a callout is out of production, we run it as an obsolete part search under counterfeit avoidance controls. Short definitions of NAS, NASM and the other prefixes are in the glossary.

Send us the callouts as they appear on the drawing

Send the part numbers and specifications exactly as the drawing shows them, with revision, quantity and need date, through the hardware request form. Seeing the original callout is how we catch converted or inactive documents before they become a receiving problem. A person replies within 1 business day, and every order ships with a certificate of conformance plus the certs your request requires. Drawings under export control go through controlled programs, not the website.

Quote this

Send the job. A person replies within 1 business day.

Part, quantity and date are enough to start. Drawings and the mutual NDA follow by reply, and controlled programs never send technical data through this site.

Export classification *

Need to attach drawings or sign the NDA first? Use the full request form.

Questions

Is a NASM part the same as an MS part?

Usually it is the same part under a different document owner. AIA, working with DoD, converted over 500 military documents to its National Aerospace Standards, and AIA says those standards continue to be procured to the MS part number. So an MS part number on your drawing may now be defined by a NASM document. Confirm the current revision on the AIA standard and put it on the PO.

Are AN parts still available?

Many are, under NASM documents. For example, AN3 thru AN20 bolts were canceled by Notice 1 on 1 December 1999 and superseded by NASM3 thru NASM20, with the part numbers kept identical. Suppliers may sell the same bolt under either designation. Check that the governing document and revision on the certificate are the ones your drawing or engineering authority accepts.

Did the Perry memo ban military specifications?

Not outright. The June 29, 1994 memo made performance specifications the default for new systems, modifications, upgrades and nondevelopmental and commercial items, preferred non-government standards where a performance spec was not practicable, and allowed military specifications and standards as a last resort with an appropriate waiver. Many documents were then canceled, inactivated or converted to industry standards, which is why old drawings show mixed callouts.

Does inactive for new design mean I cannot buy the part?

No. MIL-STD-961E says an inactive for new design item is used only in existing equipment or for future contracts to buy more of existing equipment. If you are supporting a fielded system, you can keep buying it to the same document. What you cannot do is design it into something new. Check the notice for a superseding document if engineering is starting a new design.

Can I use a commercial part on a mil-spec drawing?

Only with written approval from whoever owns the design, and only if the drawing does not make the part source controlled or QPL only. Engineering has to confirm material, strength, environment, finish and thread form, plus any rules that follow the material, such as DFARS specialty metals. Keep the approval with the purchase order and receiving record so the substitution survives an audit.

Is a MIL-PRF part better than a MIL-DTL part?

Neither is better; they control different things. Under MIL-STD-961E a MIL-PRF document states the required results and how to verify them, while a MIL-DTL document states how the item is to be made, such as materials and construction. Performance specs leave more room for alternate sources that prove the results. Detail specs pin down the design, which narrows acceptable substitutes.

Related

Sources

Ready to
source it?

A person replies within 1 business day. NDA first.

Request a quote