Aerospace Sourcing
Procurement template

Aerospace RFQ Template for Machined and Fabricated Parts

This is a copy-ready technical RFQ for machined and fabricated aerospace parts, laid out as numbered fields in blocks A to K: header, line items, technical data, material and DFARS specialty metals, special processes, AS9102 first article, certs, packaging, export classification, quantities and delivery terms, and the answers each supplier must return.

Updated

How to use this RFQ template

Copy blocks A to K below into your own RFQ form, fill every field or mark it "not applicable", and send the same document to every bidder. Each field has a number, so a supplier can take exception to "field D4" and your team can compare answers line by line.

The template is built for machined and fabricated aerospace parts: brackets, fittings, housings, weldments, sheet metal assemblies and ground support hardware made to a drawing. The example entries use real specification numbers so you can see the level of detail a supplier needs. Replace them with what your drawing and contract actually call out. The reasoning behind each item is on our aerospace RFQ checklist; this page is the fill-in version. If you would rather build the request in a browser, the RFQ builder walks through the same fields.

Two rules make the template work. First, name every document with its revision, because a spec number without a revision lets the supplier quote whatever copy it has on file. Second, ask for the supplier's answers in block K in a fixed format, so quotes come back comparable instead of as a page of assumptions.

Block A: RFQ header

The header tells the supplier who is asking, under what contract, and when the answer is due.

No.Field / clauseWhat to enter or requireWhy it matters / reference
A1RFQ number and revisionYour RFQ number plus a revision letter, for example RFQ 26-0142 Rev ALets you reissue cleanly if requirements change and void quotes against the old revision
A2Issue date and quote due dateDate, time and time zone, for example quotes due 5:00 pm Eastern on the stated dateA fixed deadline keeps the comparison fair across bidders
A3Quote validity requestedThe number of days you need prices heldMaterial prices move; state the hold you need so the supplier prices it in
A4Buyer and technical contactName, role and email of one buyer and one engineering or quality contactTechnical questions go to one place and the answers can be shared with all bidders
A5End use and contract tierCommercial, NASA, or DoD; prime contract number if clauses flow from itDecides which DFARS, FAR and customer clauses apply in blocks D, G and J
A6DPAS ratingDO or DX rating and program identification symbol, or noneA rated order carries acceptance deadlines under 15 CFR 700.13; see lead times and delivery
A7NDA referenceNDA number and date that must be in place before data releaseData does not move until the supplier is bound
A8Ship-to and receiving hoursFull dock address and any receiving windowFreight, delivery terms and lead time depend on it
Have a part like this?Send it in under a minute. A person replies within 1 business day.

Block B: Line items

One row per configuration. Do not combine dash numbers on one line unless they are truly priced as a set.

No.Field / clauseWhat to enter or requireWhy it matters / reference
B1Line number1, 2, 3 in the order of the parts listEvery answer in block K refers back to it
B2Part number and dash numberExactly as it appears on the drawing title blockThe supplier marks and certifies to this number
B3Drawing revisionThe revision letter you want built, for example Rev CA rev mismatch is the most common cause of rework
B4DescriptionShort noun name, for example bracket, machined, titaniumHelps the supplier route the RFQ to the right estimator
B5Quantities to quoteTwo or three breaks, for example 5, 25 and 100Shows how much of the price is setup; see block J
B6Need date per lineDate required at your dock for each lineLines often have different urgency
B7First article requiredYes, full; yes, partial; or no, with reasonDetail in block F
B8Material furnished bySupplier or buyer; if buyer, quantity and formChanges price, lead time and who owns the certs

Block C: Technical data package

List every document the supplier needs to quote and build, each with its revision. If a document is not listed here, assume the supplier does not have it.

No.Field / clauseWhat to enter or requireWhy it matters / reference
C1Drawing and all sheetsDrawing number, revision and sheet count, for example 4 of 4Notes and flag notes often sit on later sheets
C2Referenced drawings and parts listsEach next-assembly, detail and parts list the drawing callsHardware and secondary specs hide in referenced documents
C33D modelFile name, format (STEP AP242 or native) and which governs if model and drawing disagreeASME Y14.41 covers digital product definition; state the governing data so nobody guesses
C4Dimensioning standardThe edition the drawing cites, for example ASME Y14.5-2018Datum and tolerance interpretation depend on the edition
C5Specifications called outEvery spec on the drawing with revision, for example AMS 2700, MIL-PRF-8625The supplier must confirm it holds each one; confirm the current revision on ASSIST or SAE
C6Open changesUnincorporated ECNs, deviations or redlines, with numbersPrevents quoting a configuration that is already changing
C7TDP index for DoD dataThe TDP list or index if the program delivers one, for example under MIL-STD-31000BConfirms the package is complete before quoting
C8Distribution and export markingsDistribution statement and export legend as marked on the dataTells the supplier how to handle the files; see block J

Drawing practice for build-to-print work, including revision rules under ASME Y14.35, is covered on our build to print page.

Block D: Material and DFARS specialty metals

Name the material specification, form and condition, then say whether the specialty metals restriction applies. Alloy name alone is not enough.

No.Field / clauseWhat to enter or requireWhy it matters / reference
D1Material specificationSpec, form and condition, for example AMS 4911 (Ti-6Al-4V sheet, strip and plate, annealed) or AMS 4027 (6061-T6 sheet, T651 plate)Two lots of the same alloy bought to different specs may not be interchangeable
D2Size or stock allowanceLeave blank unless you require a specific product form or grain directionThe drawing may require grain direction relative to features
D3Mill certification contentChemistry, mechanical properties, heat or lot number, spec and revision, melt sourceYour receiving inspection checks the cert against D1; see material certs and traceability
D4DFARS 252.225-7009Applies or does not apply. If it applies, flow paragraphs (a) through (c) and (e)(2) unalteredThe clause (January 2023) covers certain steels, nickel and iron-nickel alloys, cobalt alloys, titanium and zirconium, and must flow to subcontracts for items containing them
D5Melt or production source statementRequire the country of melt on the mill cert or a compliance statement on the CoCEvidence you can show an auditor
D6SubstitutionsNo material or spec substitution without written buyer approvalStops a supplier swapping in what it has on the shelf
D7Positive material identificationRequired or not, and on what sampleOptional extra check on high-risk alloys

The exceptions, qualifying countries and the minimal content rule are explained on our DFARS specialty metals page.

Block E: Special processes and approved sources

For each process, give the spec, type and class, and the rule for who may perform it. Special processes cannot be fully verified by inspecting the finished part, which is why source approval belongs in the RFQ, not just the PO.

No.Field / clauseWhat to enter or requireWhy it matters / reference
E1FinishSpec, type, class and color, for example MIL-PRF-8625 Type II Class 1, or MIL-DTL-5541 Type II Class 3Type and class change cost, masking and electrical properties; see anodizing and chemical conversion coating
E2PassivationFor example AMS 2700, with method if the drawing restricts itPassivation method choices affect corrosion results
E3Heat treatmentFor example AMS 2770 for wrought aluminum parts, with furnace pyrometry to AMS 2750Wrong temper is not visible; certs and pyrometry records are the evidence; see heat treatment
E4Nondestructive testingMethod and spec, for example ASTM E1417 penetrant, with sensitivity level and acceptance criteriaAcceptance criteria often come from the drawing, not the method spec; see nondestructive testing
E5Source approval ruleOne of: buyer approved processor list; customer approved list for the named prime; Nadcap accredited for the commodity; or supplier choiceMany primes restrict special processors to approved lists; state yours
E6Process certificationsProcessor name, spec and revision, lot, quantity and the processor's approval referenceLets you prove an approved source did the work
E7Sequence and maskingAny required order of operations and masking areas not on the drawingOut-of-sequence plating or heat treat can scrap a lot

Block F: Inspection and AS9102 first article

State the FAI requirement and the production inspection level here so inspection labor is priced in.

No.Field / clauseWhat to enter or requireWhy it matters / reference
F1First article standardSAE AS9102 at the revision in effect on the RFQ date (currently AS9102C), full or partialPartial FAI only covers changed characteristics; see AS9102 first article inspection
F2FAI deliverableForms 1, 2 and 3 plus ballooned drawing, in PDF or your portal formatSaves a resubmission
F3FAI notification or witnessNotice period before FAI, and whether you or your customer will witnessWitness points add scheduling time
F4Production inspectionSampling plan or 100 percent, by characteristic or by lotDrives inspection hours per part
F5Key characteristicsList them, or say none; require variation data if your customer invokes AS9103KCs often require SPC or capability data
F6Source or government inspectionNone, buyer source inspection, or government source inspectionGSI needs scheduling with the government representative
F7Measurement data formatCMM report format and whether raw data files are requiredSome customers want native CMM files, not just a summary

Block G: Certifications and quality clauses

Say exactly which documents ship with the parts and which quality clauses govern the order.

No.Field / clauseWhat to enter or requireWhy it matters / reference
G1Certificate of conformanceYour required content, for example PO and line, part number and rev, quantity, lot or serial, spec compliance statement, signature and titleA vague CoC is a top receiving reject; see certificate of conformance
G2Material certsCopies of mill certs traceable to the lot shippedLinks the part to D1
G3Special process certsOne per process per lotLinks the part to E1 to E6
G4Quality clause documentYour PO quality clause set, by number and revisionUse our PO quality flow-down template as a starting point
G5Supplier quality systemAS9100, AS9120 for distributors, or ISO 9001 minimum, third-party certifiedVerify the certificate in IAQG OASIS
G6Part markingMethod and location from the drawing; MIL-STD-130 at the revision the contract cites where IUID appliesSee part marking and labels
G7Purchased hardwareCounterfeit prevention requirements for any purchased fasteners, inserts or electronic partsSee counterfeit parts avoidance

Block H: Packaging, preservation and marking

Choose military or commercial packaging explicitly. If you do not, the supplier quotes its own default.

No.Field / clauseWhat to enter or requireWhy it matters / reference
H1Packaging standardMIL-STD-2073-1 with the method and level from the contract, or ASTM D3951 commercial packagingASTM D3951 (current edition D3951-18, reapproved 2023) aims for packs that survive any shipping mode and a year of covered storage; military methods cost more
H2Package markingMIL-STD-129 where the contract requires it, or your label formatReceiving and government shipments depend on it
H3Corrosion and handling protectionCaps, plugs, VCI wrap, desiccant, individual baggingSee crating and packaging
H4CleanlinessRequired level and verification if parts are precision cleanedUse the fluid cleanliness code tool to state the level
H5ESDRequired only if the line includes electronic assembliesAvoids paying for ESD packs on bare metal

Block I: Export classification and data handling

Classify the data before the RFQ goes out and state the result here. The classification decides who may receive the files.

No.Field / clauseWhat to enter or requireWhy it matters / reference
I1JurisdictionITAR, EAR, or not subject to either (public domain or published)Sets the handling rules for everything below
I2ClassificationUSML category from 22 CFR 121.1, for example Category XV for spacecraft items; or ECCN from the Commerce Control List; or EAR99Under 15 CFR 734.3(c), items subject to the EAR but not listed on the CCL are designated EAR99
I3CUI statusWhether the data is controlled unclassified information, and the markingIf it is covered defense information, DFARS 252.204-7012 flows down; see field G4
I4Transfer methodYour secure transfer method; no controlled files by open email or public web formsRelease only to authorized persons
I5Personnel restrictionUS persons only, or as authorized by licenseSharing with a foreign person can be an export
I6Export clauseDFARS 252.225-7048 on DoD workThe clause (June 2013) requires compliance with the ITAR and EAR and must be included in all subcontracts
I7Sub-tier locationsSupplier must name any sub-tier or offshore location that would see the dataLets you check authorization before release

How we handle controlled data is set out on confidentiality and controlled programs.

Block J: Quantities, need date and delivery terms

Ask for prices in a structure you can compare, and give a need date you can defend.

No.Field / clauseWhat to enter or requireWhy it matters / reference
J1Price breaksThe quantities from B5, priced separatelyShows setup amortization
J2Non-recurring chargesTooling, fixtures, programming and FAI as separate lines, not buried in the unit priceLets you see what you pay once versus per lot
J3Release patternSingle delivery, or blanket quantity with scheduled releasesA blanket can lower unit price without inventory
J4Need dateDate at your dock, per line; use the need date planner to back-scheduleOutside processing and FAI add time
J5Partial shipmentsAllowed or not, and minimum partial quantityPartials can protect a schedule
J6Delivery termsAn Incoterms 2020 rule with named place, for example FCA supplier's dock, or your domestic FOB pointIncoterms 2020 is the ICC edition in force since January 1, 2020; the rule decides who pays freight and carries risk
J7Rated orderRepeat the DPAS rating from A6Supplier must plan to the rating

Block K: What the supplier must return

Require a structured response. A quote missing any of these fields is not complete.

No.Field / clauseWhat to enter or requireWhy it matters / reference
K1Unit price per breakPer line, per quantity in J1Comparable pricing
K2Non-recurring chargesItemized per J2No hidden NRE
K3Lead timeWeeks after receipt of order, split into material, first article and production; state if FAI approval gates productionShows where the schedule risk sits; see lead times and delivery
K4Revision quotedDrawing and spec revisions the quote is based onCatches rev mismatches before the PO
K5ExceptionsListed by field number, for example "E5: proposes processor not on list, approval requested"Turns hidden assumptions into visible ones
K6Sub-tier sourcesMaterial source (mill or distributor) and each special processor with its approval or accreditationLets you check sources against E5 before award
K7Quality systemCertificate number, standard, scope and expiryCheck it in IAQG OASIS
K8Export and data handlingITAR registration status if required, and confirmation of US persons accessNeeded before controlled data is released
K9Cybersecurity status for CUI workNIST SP 800-171 assessment in SPRS and CMMC status, if the contract requires itRequired before award on applicable DoD subcontracts
K10Quote validityDays the price holds, matching A3Avoids repricing at award

How to adapt this template

Start from the contract, not from this page. Pull the prime contract clauses, the customer quality document and the drawing notes first, then delete fields that truly do not apply and mark them "not applicable" rather than leaving them blank, so a supplier can see you considered them.

  • For commercial work with no flow-downs, blocks D4, I3, I6 and K9 usually drop out. Keep the material, process and FAI fields.
  • For DoD work, confirm with your contracts team which DFARS clauses are in your contract before filling D4, I3 and I6. Clause applicability depends on contract type, value and what is being bought.
  • For NASA work, add the project's quality requirements and any government mandatory inspection points to block F.
  • For assemblies that include purchased electronic parts, expand G7 using the counterfeit clauses in the PO template.
  • Keep the field numbers stable across RFQs so your team and repeat suppliers learn them.

This template is a starting point, not legal or regulatory advice. Have your own contracts, export compliance and quality teams review it before use, and confirm the current revision of every standard on ASSIST, SAE or the issuing body.

Send us the completed template

If you fill in this template and attach your drawing package to the CNC machining quote request, we can match the job without a round of clarifying questions. A person replies within 1 business day. We flow your fields to the suppliers we match so every quote answers the same block L, and you receive one quote, one lead time and one purchase order, with a certificate of conformance and the other certs your request lists. For export-controlled or CUI drawings, do not upload them; contact us first and we set up secure transfer to US persons only.

Quote this

Send the job. A person replies within 1 business day.

Part, quantity and date are enough to start. Drawings and the mutual NDA follow by reply, and controlled programs never send technical data through this site.

Export classification *

Need to attach drawings or sign the NDA first? Use the full request form.

Questions

What is the difference between an RFQ template and an RFQ checklist?

A checklist tells you what to think about; a template gives you the numbered fields to fill in and send. This template turns the items on our aerospace RFQ checklist into blocks A to K with example entries, so every supplier receives the same structured request and answers in the same format. That makes quotes comparable line by line and lets a supplier take exception to a specific field instead of writing general assumptions.

Which revision of AS9102 should an RFQ call for?

Call for SAE AS9102 at the revision in effect on the RFQ date, which is AS9102C at the time of writing, and say whether the first article is full or partial. Prime quality clauses often tie the revision to the RFP or PO date, so matching that wording keeps your flow-down consistent with what your customer expects. Confirm the current revision on SAE before issuing the RFQ.

Do I need to put DFARS 252.225-7009 on an RFQ for machined parts?

Only if your contract carries it and the part contains specialty metals such as titanium, certain alloy steels, nickel alloys, cobalt alloys or zirconium. When it applies, the clause says paragraphs (a) through (c) and (e)(2) go into subcontracts for items containing specialty metals, without alteration except to identify the parties. Putting it on the RFQ means suppliers quote compliant material and the certs to prove it.

Should the supplier list its sub-tier processors in the quote?

Yes. Asking for the material source and each special processor in the quote lets you check them against your approved source rules before you award, rather than discovering an unapproved plater after parts arrive. Ask for each processor's approval or accreditation reference too. If the supplier proposes a processor that is not on your list, it should flag that as a numbered exception so you can approve or reject it up front.

What delivery terms should I use on an aerospace RFQ?

Use a named Incoterms 2020 rule with a named place, or your standard domestic FOB point, and state it the same way on the RFQ and the PO. The rule decides who arranges freight and when risk passes, which changes the quoted price. Incoterms 2020 is the edition published by the International Chamber of Commerce and in force since January 1, 2020.

How should I send export-controlled drawings with this RFQ?

Classify the data first, record the result in block I, and release files only to suppliers whose people are authorized to receive them, through a secure transfer method. Do not attach ITAR or EAR controlled files to an open email or upload them to a web form. With us, controlled data never moves through the website; it goes by secure transfer to US persons only, after an NDA.

Related

Sources

Ready to
source it?

A person replies within 1 business day. NDA first.

Request a quote