Supplier Survey Questionnaire for Aerospace and Defense Buyers

A supplier survey is the numbered questionnaire a buyer sends a new shop before approving it: who they are and who owns them, what they are certified and accredited for, what they can make and measure, and how they control parts, sub-tiers, export data and cyber risk. Verify each answer against a public record, then score it.

Updated

How to use this questionnaire

Send this survey after the NDA and before the first RFQ, ask for evidence with every answer, and check each answer against a public record before you score it. A self-declared answer with no evidence scores low, no matter how good it sounds.

The questions are numbered 1 to 49 so your team and the supplier can refer to them by number. Each row says what to ask for and why. Delete rows that do not apply to the commodity, and add your own customer flow-downs. The survey decides whether a shop is worth an audit or a trial order; it does not replace an on-site audit for flight hardware, and it does not replace the quality clauses on the purchase order.

Supplier-side readers can use our supplier readiness checklist to prepare. Once a supplier is approved, deliveries are checked with the receiving inspection checklist.

Part A: company identity and registrations

Start with identity, because every later record (certificates, accreditations, export registration, SPRS) is tied to a legal name, an address and an identifier. Mismatches here are the first sign that a certificate belongs to a different site.

#Field / clauseWhat to enter or requireWhy it matters / reference
1Legal name and facilitiesLegal business name, any DBA, and the physical address of every site that will perform workMust match SAM.gov, the quality certificate and any accreditation; a certificate for another site does not cover this one
2Unique Entity ID (UEI)UEI as shown in SAM.govGSA made the SAM-generated UEI the authoritative entity identifier on April 4, 2022, replacing the DUNS number
3CAGE codeCAGE code for each site that will perform workFAR 52.204-13 (Oct 2018) lists the CAGE code among the data a registered entity enters in SAM
4SAM registration statusActive or inactive, and the registration expiration date; check exclusionsFAR 52.204-13 requires the contractor to review and update its SAM registration on an annual basis
5NAICS codes and size statusPrimary NAICS code and small business status, plus any socioeconomic certificationsDrives subcontracting plan credit; see small business subcontracting
6Key contactsNamed contacts for quality, contracts and export compliance, with emailYou need a named person for SCARs, notices and export questions, not a sales inbox
Have a part like this?Send it in under a minute. A person replies within 1 business day.

Part B: ownership and foreign ownership

Ask who owns the company, all the way up, and whether foreign persons own or control it. The answers decide whether controlled data can go to the shop at all, and they feed the representations you make to your own customer.

#Field / clauseWhat to enter or requireWhy it matters / reference
7Immediate ownerLegal name and CAGE code of the immediate owner, or "none"Mirrors FAR 52.204-17 (Aug 2020), Ownership or Control of Offeror
8Highest-level ownerLegal name and CAGE code of the entity that owns or controls the immediate ownerSame clause; a private equity or foreign parent shows up here
9Foreign ownershipDo foreign persons own more than 50 percent of the outstanding voting securities?ITAR definition at 22 CFR 120.65(a)
10Foreign controlDo foreign persons hold 25 percent or more of the voting securities, or otherwise direct policy or operations?22 CFR 120.65(b) presumes foreign control at 25 percent unless a U.S. person holds an equal or larger share; DDTC registrants must disclose this under 22 CFR 122.2(b)
11Pending changesAny planned sale, merger, relocation or closure in the next 12 monthsPrime clauses put notice periods on these events; see supplier quality clauses
12Covered telecom equipmentDoes the company use Huawei, ZTE, Hytera, Hikvision or Dahua telecom or video surveillance equipment or services?FAR 52.204-25 (Nov 2021) flows to all subcontracts and requires a report within one business day of identifying covered equipment

Part C: quality system and special process approvals

Ask for certificate numbers, not logos, and look each one up. Certificate data for 9100-series registrations sits in the IAQG OASIS database; Nadcap accreditations sit in the eAuditNet Online QML.

#Field / clauseWhat to enter or requireWhy it matters / reference
13Quality system standardAS9100, AS9120 (distributors) or ISO 9001, with certificate number, certification body and expiryVerify in IAQG OASIS; certificate data is the public tier, audit results are the private tier
14Certificate scope and sitesThe scope statement and every site listed on the certificateA scope of "machining" does not cover welding or assembly the shop also quotes
15OASIS Tier 2 accessWill the supplier grant you access to its Tier 2 audit data?AS9104/1 section 18.1 says organizations shall provide Tier 2 access to their aviation, space and defense customers on request unless they justify a refusal, as quoted in a supplier's published letter dated March 3, 2026
16Special processes in houseEach process (heat treat, chemical processing, NDT, welding, coatings) with the specification and revision it is run toSpecial processes cannot be fully verified by later inspection; see heat treatment and surface finishing
17Nadcap accreditationNadcap commodity, audit checklist, and expiration date for each accredited processVerify in eAuditNet Online QML by supplier and site; a Lockheed Martin guide (December 2017) notes that a company appearing in eAuditNet is not evidence of accreditation
18Outside special process sourcesWho performs subcontracted special processes and how the supplier confirms the source is approved for your customerPrimes restrict processors by specification; see Nadcap accreditation
19Customer approvals and statusWhich aerospace customers list the supplier, for what scope, and any probation or restricted statusAsk for evidence such as an approval letter; scope matters more than the customer name
20Escapes and open corrective actionsQuality escapes and open SCARs in the last 12 months, with statusShows whether the corrective action system works; see corrective action and SCARs

Part D: equipment, capacity, calibration and inspection

Ask what the shop can make and, separately, what it can measure. A shop that can hold a tolerance it cannot measure will ship parts it cannot prove.

#Field / clauseWhat to enter or requireWhy it matters / reference
21Major equipment listMachine or process type, axes, work envelope and quantity, as a list rather than a brochureMatch to your part size and features; see machine classes
22CapacityShifts worked, current load, and the largest order of this type completed in the last yearSeparates real capacity from optimism; plan against it with the need-date planner
23Calibration systemRecall system, interval method, and the out-of-tolerance procedure that traces back to product measured with a bad gageThe recall step is what protects shipped product
24Calibration sourcesName of each calibration provider and whether it is accredited to ISO/IEC 17025 for the measurements performed, or which standard it calibrates toISO/IEC 17025:2017 is the accreditation standard for calibration labs; NCSL International lists ANSI/NCSL Z540.3-2006 as withdrawn as an active standard in October 2020 and superseded by ISO/IEC 17025:2017, yet some contracts still cite it, so confirm which one your contract requires
25Inspection equipmentCMM make and size, measurement software, surface finish, hardness, thread and optical equipmentMust resolve your tightest tolerance; see inspection and metrology
26First article capabilitySample AS9102 report (redacted) with a ballooned drawingSee AS9102 first article inspection
27Inspector and NDT qualificationHow inspectors are trained; NDT personnel certification standard where NDT is in houseNDT is commonly qualified to NAS 410; see nondestructive testing
28Record retentionRetention period and format for travelers, certs and inspection dataMust meet or exceed what your contract requires; see records and change control

Part E: counterfeit prevention and sub-tier control

Ask how the supplier buys, not just how it builds. Most counterfeit and traceability failures enter through the supplier's own purchasing.

#Field / clauseWhat to enter or requireWhy it matters / reference
29Counterfeit prevention planWritten plan, with the standard it follows: SAE AS5553 for EEE parts, AS6174 for other materielAttach the plan; a policy sentence is not a plan
30Electronic part sourcesWhether EEE parts come only from the original manufacturer or its authorized suppliers, and what happens when they cannotDFARS 252.246-7008 (Jan 2023) sets that order and requires the contractor to notify the contracting officer when it buys from other sources
31Traceability evidenceExample of the paperwork chain from original manufacturer to deliveryThe same clause requires processes to trace electronic parts from the original manufacturer to government acceptance
32Suspect counterfeit handlingQuarantine, reporting and GIDEP participationDFARS 252.246-7007 bars returning counterfeit or suspect counterfeit electronic parts to the seller; see counterfeit parts avoidance
33Sub-tier selectionHow sub-tier suppliers are approved and monitored, and whether they must hold AS9100, AS9120 or ISO 9001You inherit your supplier's supplier
34Flow-downConfirmation that your quality clauses, right of access and special requirements go onto every sub-tier POClauses that stop at tier one are a common audit finding
35Specialty metalsAbility to certify compliance with DFARS specialty metals requirements and give melt countrySee DFARS specialty metals

Part F: export control and cybersecurity

Ask what controlled data the shop can legally and technically handle before you send any. Do not send ITAR or CUI drawings with the survey; see controlled programs for how we move controlled data.

#Field / clauseWhat to enter or requireWhy it matters / reference
36DDTC registrationRegistration status and expiration date, or a statement that the supplier does not manufacture defense articlesManufacturers of defense articles register under 22 CFR 122.1; see ITAR registration
37Export compliance programWritten program, a named empowered official or export manager, and how foreign person access to technical data is controlledControls must reach the shop floor, screens and file shares
38EAR classification and screeningHow the supplier classifies items and screens partiesApplies to commercial and dual-use work as well as defense work
39Information handledWhether the supplier will handle Federal Contract Information only, or CUI as wellSets which cyber requirements apply
40NIST SP 800-171 assessmentAssessment level, date and summary score as posted in SPRS, and the planned date to reach 110DFARS 252.204-7019 (Nov 2023) requires a current assessment, not more than 3 years old unless the solicitation sets less, posted in SPRS
41Incident reportingAbility to report cyber incidents within 72 hours via DIBNet, a DoD-approved medium assurance certificate, and any cloud service used for covered defense informationDFARS 252.204-7012 (May 2024) requires 72-hour reporting and FedRAMP Moderate equivalent cloud security
42CMMC statusCMMC level, status (conditional or final), CMMC unique identifier and date of the last annual affirmationDFARS 252.204-7021 (Nov 2025) requires a current CMMC status and annual affirmation in SPRS; confirm current program status on the DoD CIO site before making this a knockout

Part G: insurance, performance and continuity

Close with the questions that predict whether the supplier will still be delivering in a year.

#Field / clauseWhat to enter or requireWhy it matters / reference
43Certificates of insuranceCurrent certificates for the coverages your contracts team requires, with limits and expiryYour contracts team sets types and limits; ask whether the supplier can name you as additional insured
44On-time deliveryOn-time delivery rate for the last 12 months, and whether it is measured to the customer's requested date or the promised dateThe two give very different numbers; see supplier scorecards
45Quality performanceRejection rate or PPM for the last 12 months, and recent customer scorecards if the supplier will share themAsk how rejects are counted: by part, by lot or by line
46Business continuitySingle points of failure (one machine, one person, one certified material source), backup power, data backup and the recovery planISO 22301 certification is optional evidence; a written plan with named alternates is the minimum
47Financial conditionWillingness to share financial statements or a credit report under NDAA supplier that fails mid-program costs more than a late one
48ReferencesTwo or three aerospace or defense customer references for similar workAsk references about paperwork and responsiveness, not only quality
49AttestationName, title, signature and date of an officer attesting that the answers are accurateMakes the survey a record you can rely on

How to score the answers

Score in three passes: knockouts, evidence scores, then weighted totals. The numbers below are a starting point for your own procedure, not an industry standard.

Pass 1, knockouts. Any of these ends the evaluation for the scope in question: no active SAM registration when your contract requires it; an exclusion in SAM; a quality certificate that cannot be found in OASIS or does not cover the site; a required Nadcap accreditation missing from eAuditNet; foreign ownership or control for ITAR work without the needed authorization; covered telecom equipment under FAR 52.204-25; no SPRS score when DFARS 252.204-7019 applies.

Pass 2, evidence scores. Score every remaining question 0 to 3.

ScoreMeaningExample
3Answered, with evidence you verified in a public record or documentCertificate found in OASIS with matching site and scope
2Answered, with a document you could not independently verifyCalibration certificate from a lab whose accreditation scope you did not check
1Answered, no evidence"We have a counterfeit prevention plan" with nothing attached
0Not answered, or the answer shows a gapNo out-of-tolerance recall procedure

Pass 3, weights. Convert each part to a percentage of its maximum and weight it by what the commodity puts at risk.

PartMachined or processed flight partsDistributor of standard hardware
A and B, identity and ownership10 percent10 percent
C, quality and special processes25 percent20 percent
D, equipment, calibration, inspection25 percent10 percent
E, counterfeit and sub-tier15 percent35 percent
F, export and cyber15 percent15 percent
G, insurance, performance, continuity10 percent10 percent

A typical decision rule: 80 percent or more with no knockouts, approve for the stated scope; 60 to 79 percent, conditional approval with a corrective action plan, source inspection or tightened receiving; below 60 percent, do not approve. Record the scope with the approval, since a shop approved for 3-axis aluminum work is not approved for welded titanium.

Where to verify each answer

AnswerWhere to checkWhat to look for
UEI, CAGE, registration, exclusionsSAM.gov entity searchActive status, expiration date, name and address match, no exclusion record
AS9100, AS9120 certificateIAQG OASISCertificate listed, site and scope match, not suspended or expired
NadcapeAuditNet Online QMLCommodity, audit checklist in the scope, issue and expiration dates for that site
Calibration accreditationThe accreditation body's directory named on the lab's certificateScope covers the measurement type and range
NIST SP 800-171 and CMMCSPRS printout or screenshot from the supplier, with datesScore, assessment date, CMMC status and affirmation date
DDTC registrationThe supplier's current registration letterRegistrant name matches the legal name, expiration date in the future

Re-verify at each re-survey. Certificates, accreditations, SAM registrations and SPRS scores all expire on different cycles.

How to adapt this template

  • Delete parts that do not apply. A COTS distributor does not need Part D in depth; a machine shop with no electronics needs only the counterfeit rows that cover materiel.
  • Add your customer's requirements by document and revision, for example a prime's supplier quality manual, and ask the supplier to confirm it has read it.
  • Set re-survey intervals by risk, and trigger an early re-survey on an ownership change, a lost certificate or a quality escape.
  • Keep the completed survey, evidence and score with the approval record.
  • Have your own contracts, legal and quality teams review the template before use. It is a working draft for buyers, not legal advice, and it does not replace your quality management system procedures.

What goes on the RFQ and PO after approval

Approval sets the scope; the RFQ and PO carry the requirements. Name the approved scope, the quality clauses and revisions, FAI, special process sources, counterfeit and specialty metals clauses, export classification and the paperwork to ship with each lot. The RFQ builder and the aerospace RFQ checklist cover what to send, and supplier quality clauses covers how primes write those requirements.

Skip the survey cycle on your next job

We qualify suppliers against requirements like these, flow your clauses down by number and revision, check the paperwork before delivery and ship with a certificate package. Mutual NDA before files, and controlled data never goes through the website. Request a quote with your requirements attached; a person replies within 1 business day.

Quote this

Send the job. A person replies within 1 business day.

Part, quantity and date are enough to start. Drawings and the mutual NDA follow by reply, and controlled programs never send technical data through this site.

Export classification *

Need to attach drawings or sign the NDA first? Use the full request form.

Questions

What is the difference between a supplier survey and a supplier audit?

A survey is a questionnaire the supplier fills in and you verify against records and documents. An audit is an on-site or remote examination of how the supplier actually works, with objective evidence gathered by your auditor. Buyers use the survey to screen and scope, then audit the suppliers that pass, especially for flight hardware, special processes and new technologies. A survey alone is weak evidence for high-risk parts.

How do I check a supplier's AS9100 certificate?

Look it up in the IAQG OASIS database by company name and site. Confirm that the certificate is listed, that the site address and scope match the work you are buying, and that it is not suspended or expired. Certificate data is public. Audit results are in the private Tier 2 data, which suppliers are expected to share with aerospace customers on request under AS9104/1 unless they justify a refusal.

Can a supplier with foreign ownership work on ITAR parts?

Possibly, but it changes what you can send them. ITAR treats a firm as foreign owned above 50 percent foreign ownership of voting securities and presumes foreign control at 25 percent under 22 CFR 120.65. Foreign persons need authorization to receive ITAR technical data. Ask the questions in Part B, then have your export compliance team decide before any controlled data moves.

Should CMMC be a knockout question?

Only if your contract requires a CMMC level from the supplier. DFARS 252.204-7021 requires a current CMMC status where the contract specifies a level, and it flows to subcontracts involving FCI or CUI. On July 13, 2026 DoD suspended the Phase II third-party assessment requirements, while Phase I self-assessments and DFARS 252.204-7012 still apply. Confirm the current program status before you set the rule.

How often should suppliers be re-surveyed?

Set the interval by risk in your own procedure. Many buyers re-survey critical suppliers more often than low-risk ones, and trigger an immediate re-survey after an ownership change, a lost or suspended certificate, a move to a new site or a significant quality escape. Every re-survey should repeat the public record checks, because registrations and accreditations expire on their own cycles.

Can I use this questionnaire as written?

Use it as a draft. Remove rows that do not apply to the commodity, add your customer's flow-downs by document and revision, and set your own scoring thresholds. Your contracts, legal and quality teams must review it before it is sent, because it will become part of your supplier approval records. We provide it as a buyer's working template, not legal advice.